Заявка успешно отправлена, в ближайшее время с Вами свяжется наш менеджер. Спасибо!

"Fort Shevchenko"

Wind Farm with installed power of 43 MW

- 23 Vestas wind turbines with a unit installed capacity of 2 MW

- Power collection substation SS 110/20 kV

- 110 kV overhead power line

Competencies:

  • Function: Design development, EPC
  • Installed Power: 43 MW
  • Date of commissioning: March 2019.
  • Location: West Kazakhstan region, Aktau city
  • Customer: KT Redkometalnata Joint Venture LLP

Share: