"Sarybulak"

Wind Farm with installed power of 25 MW

- 28 Vestas wind turbines with a unit installed capacity of 0.9 MW

- Power collection substation SS 110/20 kV

- 110 kV overhead power line

Competencies:

  • Function: Design development, EPC
  • Installed Power: 25 MW
  • Date of commissioning: November 2017
  • Location: Almatinskaya region, Almaty city
  • Customer: Sarybulak LLP